loader image

Construction of extra production line

Due to a sudden need for extra production capacity, this customer was looking for a machine constructor who could build an extra production line in a minimum of time for their location in China.

For this customer, CTESO built a copy of the existing production line, including the required adjustments and improvements, in just 5 months.

  • Project management
  • Risk assessment and risk analysis in accordance with European Machinery Directive
  • Mechanical assembly
  • Electrical assembly
  • Assembly of compressed air system
  • Integration of safety shielding based on the risk analysis
  • Support during start-up and testing of production line
  • Seaworthy packaging of machines
Services provided:
  • Diensten